Technical decisions, clearly explained.
Materials, print, packaging, artwork and logistics connected directly to estimator choices.
Why does quantity change the unit price?
Setup costs are shared by every unit, which is why run length changes the result so visibly.
↗GuidePrint files: bleed, resolution and CMYK
Three checks that reduce white edges, soft images and unexpected colour shifts.
↗GuideHow many cards should a custom deck contain?
Card count affects print, collation, deck thickness and packaging.
↗GuideMatt or linen-finish cards?
The surface affects glare, feel, shuffling and cost.
↗GuideMatching games: pairs and tile size
Age, game time, tile size and box volume are connected.
↗GuideWhat is needed to price a board game?
A clear bill of materials is more useful than a general description of the idea.
↗GuideFolding carton or rigid box?
Compare cost, protection, logistics and perceived value.
↗GuideWhy does volume affect freight cost?
Two products with the same weight can have very different pallet costs.
↗